20(02) an apartment building
info
construction of an apartment building in Schaerbeek
Along the future Parkway, the project transforms a concrete office building into 38 apartments. The concrete structure and floors are reused and three new levels are superposed to the existing. The hollowed out angles of the volume become double orientated balconies and a collective patio and garden connect the spaces to the ground and the park to come.
Programme: 38 apartments, parking, collective patio and garden
Location : Schaerbeek, BE
Client: Revive
Status: planning permission
Surfaces: 6.300 m²
Cost: 5,750,000 €
Team: A PRACTICE., architecture / BUREAU BOUWTECHNIEK, execution architecture / ATELIER VELDWERK, landscape / JZH, stability, thermal and fluid engineering / DE FONSECA, acoustics